PT | EN | FR | ES

 

 

 

 

 

PORTUGAL – “ALTO TÂMEGA” HYDROPOWER DEVELOPMENT – GEOLOGICAL & GEOTECHNICAL ASSISTANCE

In October, Iberdrola, Ingeniería y Construcción awarded to the COBA Group the provision of the geological & geotechnical assistance services within the scope of the supervision of the “Alto Tâmega” Hydropower” Development, located in the Ribeira de Pena municipality.

This hydropower complex involves the construction of three hydraulic undertakings, namely: Gouvães, which consists of a concrete gravity dam with a maximum height of 30 m and a powerplant with an installed capacity of 880 MW; Alto Tâmega, with a 107,5 m-high concrete arch dam and a powerplant with an installed capacity of 160 MW; Daivões, which comprises a concrete arch dam with a maximum height of 76 m and a powerplant with an installed capacity of 114 MW.

The services to be rendered namely the geological & geotechnical supervision of the several envisaged works comprehend the deployment of technicians specialized in the fields of geology and geotechnics that will integrate the technical assistance and supervision team mobilized by IBERDROLA for this assignment.

 

Lx, 30 Nov 2015