Environmental Engineering

Marine Supply Base at the Amboim Harbour | Angola

Thumbnail Placeholder

Short Description

 

 

Detail

Client: HMC – Heerema Marine Contractors Nederland, B.V. Angola
Year: 2008 - 2009
Phases of the Study: Environmental and Social Impact Study
 

Environmental Management of “Parque das Nações” | Portugal

Thumbnail Placeholder

Short Description

The objective of this contract was the monitoring of relevant environmental aspects, aiming at ensuring the highest levels of environmental quality of the area.

The environmental monitoring and management involved the assessment of noise levels, measurement of air quality, verification of the operation of the meteorological station including data collection and treatment, follow-up of the surface water quality evolution, monitoring of the pluvial and storm waters network, operation and maintenance of the Beirolas Landfill equipment and the follow-up of changes in the sediments and surface waters in the Tagus and Trancão rivers.

Detail

Client: Parque EXPO, SA.
Year: 2005 - 2012
Phases of the Study: Environmental Management (Studies undertaken in Joint-Venture)
 

Alto Lindoso, Touvedo, Caldeirão and Trinta Weir Hydropower Developments | Portugal

Thumbnail Placeholder

Short Description

This study focused on the Monitoring Programme for the Assessment of the Efficiency of the Ecologic Flow Regime of these undertakings.

The monitoring programme included annual samples of the biological elements, in three monitoring stations downstream to each dam and quarterly samples of the physicochemical elements.

The works followed the protocol for the monitoring, under the Water Framework Directive from INAG (Instituto Nacional da Água [Portuguese Water Institute]), and included the allocation of a large and specialised technical team, using the latest methods and technologies in these fields, such as electrofishing.

Detail

Client: LABELEC, S.A.
Year: 2009 - 2016
Phases of the Study: Monitoring for Assessment of the Efficiency of the Ecologic Flow Regime
 

“George Dimitrov” Neighbourhood | Mozambique

Thumbnail Placeholder

Short Description

The Environmental and Social Impact Assessment Study (ESIA) of the Urban Requalification of the “George Dimitrov” Neighbourhood, in the Municipal District of KaMubukwana, has the purpose of complying with the environmental impact assessment legislation in force.

The environmental studies undertaken aimed at a sustainable and integrated requalification of the “George Dimitrov” Neighbourhood, based on an appropriate methodology, which would allow the optimization and balance of the envisaged interventions, from an environmental and social point of view, as well as the compliance with the requirements and globally accepted criteria in these matters.

Detail

Cliente: Maputo Municipal Council
Year: 2013 - 2014
Phases of the Study: Environmental Prefeasibility Study and Scoping Study (EPSS) and Environmental and Social Impact Assessment Study (ESIA)
 

 

 

 


Your personal data – name and email address – will be kept by COBA Holdings, S.A. with the purpose of keeping you up to date with the important moments of COBA Group’s companies, by sending an electronic Newsletter. Your data will not be used for any other purposes. You may exercise the rights of objection, access, rectification and the right to be forgotten of the personal data provided, in writing, addressed to the Communication and Corporate Responsibility Direction – COBANews Service, COBA Holdings,S.A., Avenida 5 de Outubro, 323, 1649-011 LISBOA, or by email to cobanews@cobagroup.com