Geometry, Pavement and Drainage works of Avenida Brasil | Brazil

Short Description
Detail
Client: Transbrasil Joint-venture |
Years: 2014 - 2015 |
Phases of the Study: Final Design |
Capanda Hydropower Development | Angola

Short Description
Detail
Client: PRODEL - Empresa Pública de Produção de Electricidade [Public Company for Electricity Generation] |
Years: 2016 |
Phases of the Study: Bathymetric Survey |
Cambambe Hydropower Development | Angola

Short Description
This contract aimed at carrying out a topographic survey of the tunnels, after the excavation and concrete placing works of the Cambambe dam.
The topographical survey was carried out by state-of-the-art static laser scanner technology, associated with classic topography methods by the use of total stations and digital levels.
This study allowed the comparison of the tunnel’s cross section and earthworks volume with the existing project’s information.
Detail
Client: ODEBRECHT |
Years: 2014 |
Phases of the Study: Topographic Survey |
Kholombidzo Hydropower Development | Malawi

Short Description
Detail
Client: Ministry of Natural Resources, Energy and Mining |
Years: 2013 |
Phases of the Study: Topographic Survey |
Sanitation Network of the Coastal Strip of Luanda | Angola

Short Description
Detail
Client: IDOM/CEDRUS |
Years: 2013 |
Phases of the Study: Topographic Survey |