COBA in Media
COBA Group present in "The Energy Year Angola 2022"
Fernando Prioste, CEO of the COBA Group, talks to "The Energy Year" about Angola's potential for deploying pumped-storage hydroelectricity and hydrogen solutions.
As Angola develops a robust energy industry, he highlights the important role that the COBA Group can play in the country's development.
19/04/2022
Televisão Popular de Angola
COBA initiated the field mission for the assessment of the existing situation, comprising meetings with local institutions, visits to the cities’ neighborhoods, public consultation and surveys to subsequently support the "Preparation of the Participatory Sanitation Master Plans and the Technical Specifications of the Tender Processes of the cities of Luena, N'Dalatando, Cuito and Huambo, in line with the CWIS (Citywide Inclusive Sanitation) approach".
The project is developed in association with Artelia and Águas de Portugal and is of special importance for the populations of the cities under study, ensuring future access to adequate sanitation conditions.
07/04/2022
Televisão de Cabo Verde
On June 16th COBA presented the conclusions of the first phase of the Feasibility Study of the Pumped-Storage hydropower plant on Santiago island, in a Workshop that took place in Praia, attended by the Minister of Industry, Trade & Energy and the Minister of Agriculture and Environment. Experts from COBA and the consortium partner ARTELIA, as well as from the local company CPR, participated in this event, both in person and online.
This is a project of great importance for Cape Verde, funded by the Luxembourg Development Agency, which aims to achieve the targets set for the island's energy transition to a system based mainly on renewable energies.
18/06/2021